The Airport Link Project consists of a new Metrorail Station (3 floor ~78,000 sf); 3 Traction Power Substations; new Operating Rail Systems; new and reconstructed roadway, and a 2.4 mile elevated Guideway. The main objective of the project is to connect the new MIA Mover from Miami International Airport to the existing Earlington Heights Metro Station.